Most tools hand you a result. This one hands you the result, the measurements behind it, the list of what it could not finish, and the audit trail a reviewer would ask for anyway.

DNPROP/2001 REV A — PROFILEvector · 243 paths
How the work gets done

Four phases, in order,
no skipped gates

01
Extraction

The source is read before anything is drawn: particulars, view list, frame system, every deck height, every room area and capacity. The extraction table is shown to you — what is illegible is marked ILLEGIBLE, never guessed.

02
Construction

One view at a time. Hull form from calibrated stations, bulkheads at true frame positions, decks at their stated heights, machinery as real footprints — not four walls and a label.

03
Annotation

Frame grid, level callouts, leaders, dimensions, title block. Labels carry areas and capacities only where the source states them. The particulars panel quotes the source.

04
QA gate

Six read-only checks against the file: measured versus stated, the dimension audit, completeness by name, critique, a look at the rendered sheet, and the stated-value audit. Nothing ships on a FAIL.

How it fits together

Four disciplines, each master
of what it can represent

2D DRAFTING

The issued GA, its dimensions and its title block

DXF — real entities on real layers
EXACT 3D

Parametric solids and surfaces, built to tolerance

STEP, for the shipyard and the supplier
ANALYSIS

Hydrostatics, resistance, structure, seakeeping

measured against the form, not estimated from it
VISUALISATION

Review renders and client delivery

a model the owner can turn in a browser

A drawing is never asked to carry what it cannot represent. The GA holds the arrangement; the solid model holds the geometry; the analysis holds the numbers. Each one answers only for its own domain, and every claim on the sheet names which one it came from.

Where this is going

From checking drawings
to designing hulls

A system that only measures can check someone else’s drawing. The loop closes when it proposes its own hull and scores it against a real objective — resistance, GM, seakeeping, steel weight — then does it again with a better one.

VALIDATION TARGETS — KCS · KVLCC2 · DTMB 5415
PUBLISHED TOWING-TANK FIGURES, NOT ANECDOTES

The loop — one hull, one objective, repeated
PARAMETRIC HULLform parameters inDISCRETISEpanels and stationsRESISTANCEpower · free surfaceHYDROSTATICSdisplacement · GZSEAKEEPINGRAOs · added massSCANTLINGSstructure · bucklingNEXT HULLrepeat until objective met
Absolute rules

The standard of work, written down

These are not aspirations. A run that violates any one of them is treated as a failed job.

Millimetres, always

A 26 m vessel is 26 000 units. Metres are converted on input and never mixed.

No invented values

Deck heights, areas and capacities come from the source. Estimates are marked (EST) and never reach the sheet.

No silent omissions

Every view, room and label in the source is drawn — or named on the omissions list you receive.

“Verified” means measured

A number is verified only when a measurement returned it. A value typed into a label is not verification.

What goes in, what comes back

The contract

INPUT

Client PDF, photo of a marked-up print, existing DXF — or a sentence describing the vessel

EXTRACTION

Every stated number transcribed: particulars, deck heights A.B.L., frame system, areas, capacities

REFERENCE

Frame grid, base line, design waterline — anchored to stated values, not to pixels

OUTPUT

Real DXF (AC1024) you can open and edit, plus a plotted PDF of the sheet for review

SHEET

A1 at stated scale in the Aries frame — border, particulars panel, revision table

REPORT

Measured-versus-stated table, omissions list, and what was not checked (scantlings, stability, class)

Order of work

Drafting assistant today.
Design system next.

1

Compliance matrix — replaces manual RFQ counting

IN PROGRESS
2

2D to 3D from the drawing — deck solids, equipment placement, mirrored from detected symmetry

IN PROGRESS
3

A scored set of golden GA jobs, re-run automatically on every change

IN PROGRESS
4

Hydrostatics validated against real, published hull data

VALIDATION
5

Close the design loop — one hull, one objective, scored end to end

DESIGN
6

Hull generation, once the loop can score what it makes

DESIGN
7

Structural analysis — the last big untouched domain

DESIGN

Ready when your next drawing is