AI CAD for naval engineering

The AI drafter for your engineering team

Drafting eats the hours that design deserves. Describe the work, or hand over the drawing a client sent you — and get back a CAD file you can open, measure and hand on.

DNPROP/2001 REV A — PROFILEvector · 243 paths
26 000
mm LOA, drawn to the millimetre
9
views reconstructed per GA sheet
0
dimension overrides tolerated
1:100
plot scale, honoured on the sheet

Built for design offices & shipyards

GULF SHIPYARD GROUPMERIDIAN NAVALHARBOURLINE DESIGNAL SAQR MARINEFOULATH ENGINEERINGNORDHAVN CONSULTTIDEWATER OFFSHOREARIES MARINEGULF SHIPYARD GROUPMERIDIAN NAVALHARBOURLINE DESIGNAL SAQR MARINEFOULATH ENGINEERINGNORDHAVN CONSULTTIDEWATER OFFSHOREARIES MARINE
The workflow

From a marked-up print
to a measured sheet

It reads the drawing before it draws

Every stated number is transcribed first — particulars, deck heights, frame spacing, room areas, title-block rows. Geometry is anchored to what the source states, never to what looks about right.

Phase 1 of 4
EXTRACTION TABLE — PHASE 1
LOA26 000 mm
FRAME SPACING600 mm
WHEELHOUSE TOP13 150 A.B.L.
BRIDGE DECK9 700 A.B.L.
BATTERY6 500 kWh
DRAUGHT (DESIGN)3 500 mm
Why teams trust the output

Drawings you can put
your name on

Real CAD, not a picture

Every line is geometry with real coordinates in a real drawing file. Open it in your CAD package and dimension it yourself — the numbers agree.

Dimensions that cannot lie

A dimension always shows what the geometry measures. When the two disagree, the drawing gets fixed — never the label.

It checks its own work

It measures what it drew against what you asked for, looks at the plotted sheet, and tells you plainly what it could not finish.

Your standards, your title block

Sheets come out in the Aries frame — or in yours — with the particulars panel filled from measured values, ready for review.

The future of QA

Review the design.
Stop proofreading geometry.

Every sheet arrives already checked against its own spec — dimensions audited against the geometry, every view and label accounted for, the verdict attached. It spots the 6 400 hull labelled 12 400 before your senior architect does. Hours of checking become minutes of actual reviewing.

Every number carries its provenance
the value644.8 m³
where it came frommeasured this session · 20 480-face hull mesh · ±0.05%
what it is notintact only · KG NOT SUPPLIED · not class-approved
The QA gate — ships with every sheet
a) MEASURE — LOA 26000 = 26000 stated · beam 12400 = 12400
b) DIMENSION AUDIT — 4 dimensions · 0 overrides · PASS
c) COMPLETENESS — 9 of 9 views present · tank plan by name
d) CRITIQUE — 0 open issues
e) VISUAL — sheet renders inside A1 border · scale 1:100
f) STATED VALUES — every label traces to the extraction table
Working today, measured

Numbers with a source

237,162
vector segments read from a single GA PDF
13.843
mm per point — scale calibrated from the sheet itself
7,500
damage cases evaluated in 1.3 minutes
1.7 s
to a photoreal render of the finished hull
153
drafting operations, every one regression-tested
82,168
hull forms behind the form library
From the drawing office
“It caught a beam that read 12 400 on a hull drawn 6 400 — before our reviewer did. That is the bar now.”
V. Krishnan
Senior Naval Architect
“The extraction table alone saves an hour per drawing. It reads the title block better than most juniors.”
J. Vaz
Design Office Lead
“We stopped red-lining dimensions. Now we red-line design decisions, which is what reviews are for.”
A. Foulath
Engineering Manager
“Asked for a 76 m barge GA from a phone photo of the print. Got a measured DXF and an honest omissions list.”
M. Nordhavn
Project Engineer
“It says what it did not draw. Nobody on my team has ever been that reliably honest.”
S. Al Saqr
Managing Director
“It caught a beam that read 12 400 on a hull drawn 6 400 — before our reviewer did. That is the bar now.”
V. Krishnan
Senior Naval Architect
“The extraction table alone saves an hour per drawing. It reads the title block better than most juniors.”
J. Vaz
Design Office Lead
“We stopped red-lining dimensions. Now we red-line design decisions, which is what reviews are for.”
A. Foulath
Engineering Manager
“Asked for a 76 m barge GA from a phone photo of the print. Got a measured DXF and an honest omissions list.”
M. Nordhavn
Project Engineer
“It says what it did not draw. Nobody on my team has ever been that reliably honest.”
S. Al Saqr
Managing Director
Start with one drawing

Pick a job you already know the answer to

See how close it gets — and check the measured values against yours.